The Project Brief

Aim

To re-landscape the entire property following an extension and renovation of the Manor House.

Considerations

The Manor house had been recently extended and refurbished and many new services had be run and needed to be avoided, including an underground gym under the driveway. The property was to be occupied throughout and access kept free at all times.

Current condition

The site had been partially cleared due to building works but the majority is still in place and needed to be cleared completely. Tight access needed to be factored into all deliveries, which included over 150tonnes of new soil in.

Planning and Preparation

Progress

The Finished Article

Scope of Works

  • 50 linear meters of 9-12inch decorative boundary walls, including caste copings and decorative bespoke iron work.
  • New entrance gates including planter and bespoke ironwork and automated timber gates.
  • Three large terrace areas totalling 470m2 of large format porcelain paving including long sweeping steps to main lawn and rear driveway, to be lit at night.
  • Two resin bound driveways totalling 375m2, to be edged with a double granite sett.
  • To lay 1560m2 of new turf to create three new lawns, on 300mm of new soil, and drainage to allow for free draining soil.
  • To install a fully automated irrigation system for the lawns and planting areas including a 10,000 litre water storage tank.
  • To plant up all the new borders created with approximately 1500 shrubs, perennials and trees.

Project Outcome

  • Project duration: 14 months.